The Lensbury Hotel
Twickenham, UK 2014

Location

Twickenham, United Kingdom

Brand

Boutique Hotel

Year

2014

Interior Design services

Space planning
FF&E Selections
Lighting design
Specialist Joinery Designs
Budgets & Purchasing
Bathroom Design
Furniture Design

About

We started this project being asked to design 2 suites from the existing function room, however this project grew quickly to include the full renovation of 36 guest-rooms,  bathrooms & corridors, a soft upgrade of 40 bedrooms and the creation of 2 original suites.

Ascot Suites - Full refurbishment of 36 no. Bedrooms, Complete renovation of bathrooms, creation of additional Bedrooms and reconfiguring existing bedrooms, full renovation of corridors (including new ceilings, lighting, entry doors) and Entry Lobby including planning permission for new entry to the building. Included all M&E coordination with M&E consultants with regards to installing new AC units into the rooms, new lighting and electrics. New staircase design and lift car interior. Site supervision & snagging.

Bedroom Soft Upgrade - Soft refurbishment of 40 bedrooms, using existing casegoods, but upgrading carpets, wall covering, artwork, lighting, window treatments, upholstery and bed throws and cushions. Site supervision & snagging.

Engle Suites Creation – We were asked to create 3 suites from the existing Function rooms/ kitchen area. This included space planning of 3 suites with full bathrooms, bespoke case goods, built in wardrobes, new ceilings, new air conditioning, electrics and lighting. New built in joinery, new entry door, and bathroom doors. Ironmongery package, sanitary schedule and specialist lighting schedules. Site supervision & snagging.

Testimonial

Marian Predovnik has carried out 3 projects for us over the last twelve months. The projects were a total upgrade of our Ascot Building that consists of a 37 bedroom, creating 3 suites and soft furnishing upgrade of 30 bedrooms in the main hotel. The total value of the projects were £1,850,300.

Marian was recommended to us by a builder who had worked with her in another project, who praised her designs and works ethics highly. The standard of design and ability to react to the client’s wishes and thoughts were of high professional standard. The designs were managed and kept within the budgets and the finished products were as agreed at the beginning of the project. Marian’s approach to the contractors and suppliers was professional and ensured we, the client had what we expected and also represented the Lensbury in a manner of professionalism that we would expect all of our representatives to do. We will continue to use Black Box for the foreseeable future. Please do not hesitate to contact me if further information is required.’